Cancellation Information
* Date Inspection was
Scheduled
(mm/dd/yyyy)
* Type of Inspections to Cancel
(Use Control Key
for Multiple Inspection types)
Foundation - Footings,
Foundation - Monolithic Slab
Foundation - Stem Wall,
Foundation - Retaining Wall
Foundation - Sign (use for inspection of a commercial sign
foundation)
Insulation - Slab
Erosion (Temporary Silt and Erosion Control)
MH Setup (Block and Tie)
MH Concrete (anything pertaining to anchorage)
Mechanical - Appliance/Final
Mechanical - Fireplace/Woodstove
Mechanical - Furnace,
Mechanical - Gas Piping, Exterior,
Mechanical - Gas Piping, Interior,
Mechanical - Hot Water Tank,
Mechanical - HVAC Duct System
Mechanical - Radiant Floor Tubing
Mechanical - Rough-in
Mechanical - Tank (Propane or Liquid Fuel Tank and Piping)
Plumbing - Ground Work,
Infiltration Pit - Stormwater System Inspection (Required to show
the integrity of the I-pit and all connections going to it)
Plumbing - Rough-in,
Underfloor Inspection (as per IRC effective 1 July 2004)
Framing (plumbing or mechanical must be approved before ordering),
Deck
Shear Wall - Nailing
Insulation (must have framing approved),
Sheetrock - Wall Board, Drywall, GWB,
Masonry
Ceiling Grid
Reroof - Final
Sign - Final (for inspection of a commercial sign)
Retaining Wall
Final, Pre-Occupancy (requires two days advanced notice, Certificate
of Occupancy is mailed after approval of Final Inspection)
Reschedule Information
*
Would you like to
reschedule at this time?
Yes
No
If Yes, for What Date?
(mm/dd/yyyy)
Type of Inspections to Reschedule: (Use Control Key
for Multiple Inspection types)
Foundation - Footings,
Foundation - Monolithic Slab
Foundation - Stem Wall,
Foundation - Retaining Wall
Foundation - Sign (use for inspection of a commercial sign
foundation)
Insulation - Slab
Erosion (Temporary Silt and Erosion Control)
MH Setup (Block and Tie)
MH Concrete (anything pertaining to anchorage)
Mechanical - Appliance/Final
Mechanical - Fireplace/Woodstove
Mechanical - Furnace,
Mechanical - Gas Piping, Exterior,
Mechanical - Gas Piping, Interior,
Mechanical - Hot Water Tank,
Mechanical - HVAC Duct System
Mechanical - Radiant Floor Tubing
Mechanical - Rough-in
Mechanical - Tank (Propane or Liquid Fuel Tank and Piping)
Plumbing - Ground Work,
Infiltration Pit - Stormwater System Inspection (Required to show
the integrity of the I-pit and all connections going to it)
Plumbing - Rough-in,
Underfloor Inspection (as per IRC effective 1 July 2004)
Framing (plumbing or mechanical must be approved before ordering),
Deck
Shear Wall - Nailing
Insulation (must have framing approved),
Sheetrock - Wall Board, Drywall, GWB,
Masonry
Ceiling Grid
Reroof - Final
Sign - Final (for inspection of a commercial sign)
Retaining Wall
Pre-Occupancy Final, (requires two days advanced notice, Certificate
of Occupancy is mailed after approval of Final Inspection)