Bay Shore Drive and Washington ImprovementsRestrictedfrom
Bay Shore Drive, Washington Ave, Linder Way
10/5/202011/30/2022ConstructionModerate delays between 5 and 10 minutes
Intersection of Washington/Bayshore/Lider closed December 1 - 4 during working and nonworkng hours. Use alternate routes.

Drilling from the Waterfront Park to intersection of Washington and Bayshore. Flaggers will be onsite directing traffic alternating 1 lane.
47.6485227-122.693623Central
Ridgetop Blvd NWRestrictedbetween
Ridgetop Blvd NW between the existing intersection of NW Mhyre Rd and the existing south bound on-ramp of NW Wagga Way (SR303)
7/31/20202/28/2021ConstructionModerate delays between 5 and 10 minutes
Seton Construction is planning on shifting the lanes on Ridgetop Blvd. at Sid Uhinck starting July 31st. The lane shift will eliminate the center turn lane.
Improvements to Ridgetop Blvd NW between the existing intersection of NW Mhyre Rd and the existing south bound on-ramp of NW Wagga Way (SR303), including the relocation of the intersection with NW Sid Uhinck Drive to align with the new Harrison Hospital entrance and realignment of a portion of NW Sid Uhinck Drive, in Kitsap County. This project consists of Site Preparation, Grading, Storm Drainage, Utilities, Paving, Concrete, Striping, Signalization, Planting and Erosion Control and related work. Work will be ongoing in the area through October 2020.
47.655047-122.672887Central
Ridgetop Boulevard NWRestrictedbetween
Quail Run Drive and Pinnacle Court NW
10/14/201912/31/2020ConstructionModerate delays between 5 and 10 minutes
Contractor is working on roundabouts and will be directing traffic alternating one lane at a time.

Expect intermittent traffic delays between 5 and 10 minutes during construction.
47.672046-122.666007http://Kcowa.us/RidgetopBlvdCentral
Seabeck-Holly Road NWClosedbetween
Foley and Larson
8/12/20203/1/2021ConstructionRoad closed - Use detour or other alternate routes
Hood Canal Salmon Enhancement group Seabeck Creek culvert removal project.  Contractor Nordland Construction has begun excavating the roadway inside the workzone to remove the existing culvert in preparation to build a new bridge extending over Seabeck Creek.  There is absolutely no thru traffic allowed, travelers must follow the detour as the alternate route around the construction closure.  Project to continue into the 2021 calendar year. For project details visit the Hood Canal Salmon Enhancement Group's project page here http://kcowa.us/seabeckholly
47.628099-122.837814https://www.pnwsalmoncenter.org/seabeck-creek-restoration/Central