| Bay Shore Drive and Washington Improvements | Restricted | from | Bay Shore Drive, Washington Ave, Linder Way | 10/5/2020 | 11/30/2022 | Construction | Moderate delays between 5 and 10 minutes | Alternating one lane on Byron for water and storm all week. The intersection at Washington Ave NW and Bay Shore Drive NW will reopen by Saturday, Feb. 27th. | 47.6485227 | -122.693623 | | Central | |
| Columbia Street NE | Restricted | from | Lincoln to Essex | 3/1/2021 | 3/5/2021 | Maintenance | Moderate delays between 5 and 10 minutes | Full Depth Patching -Moderate Delays – Flaggers Present – Weather Dependent | 47.747733 | -122.575843 | | North | |
| Illahee Road NE | Restricted | | Entire length | 3/1/2021 | 3/5/2021 | Maintenance | Moderate delays between 5 and 10 minutes | Ditching -Flaggers present , Moderate delay, weather dependent | 47.628891 | -122.597155 | | Central | |
| Ridgetop Blvd NW | Restricted | between | Ridgetop Blvd NW between the existing intersection of NW Mhyre Rd and the existing south bound on-ramp of NW Wagga Way (SR303) | 7/31/2020 | 3/31/2021 | Construction | Moderate delays between 5 and 10 minutes | Seton Construction is planning on shifting the lanes on Ridgetop Blvd. at Sid Uhinck starting July 31st. The lane shift will eliminate the center turn lane. Improvements to Ridgetop Blvd NW between the existing intersection of NW Mhyre Rd and the existing south bound on-ramp of NW Wagga Way (SR303), including the relocation of the intersection with NW Sid Uhinck Drive to align with the new Harrison Hospital entrance and realignment of a portion of NW Sid Uhinck Drive, in Kitsap County. This project consists of Site Preparation, Grading, Storm Drainage, Utilities, Paving, Concrete, Striping, Signalization, Planting and Erosion Control and related work. Work will be ongoing in the area through October 2020. | 47.655047 | -122.672887 | | Central | |
| Ridgetop Boulevard NW | Restricted | between | Quail Run Drive and Pinnacle Court NW | 10/14/2019 | 6/30/2021 | Construction | | Limited construction activities; no current traffic impacts. | 47.672046 | -122.666007 | http://Kcowa.us/RidgetopBlvd | Central | -122.666007 |
| SE Spencer Avenue | Restricted | from | Bethel Burley to EOM | 3/1/2021 | 3/2/2021 | Maintenance | Moderate delays between 5 and 10 minutes | OH Brushing -Weather dependent/Flaggers present/Moderate delays | 47.467849 | -122.637408 | | South | |
| Seabeck Highway NW | Restricted | between | NW Holly Road and NW Newberry Hill Rd. | 2/25/2021 | 6/25/2021 | Construction | Daytime road closure | PSE is implementing daytime road closures restricting local access beginning February 25. The road is closed Monday through Friday, 7 a.m. to 7 p.m. Construction is expected to continue through late June. For more information, go to the project page: http://kcowa.us/seabeck2 | 47.621879 | -122.764002 | | Central | |
| Seabeck Highway NW | Restricted | from | Old Sawmill to Roundabout | 3/1/2021 | 3/5/2021 | Maintenance | Moderate delays between 5 and 10 minutes | OHB -Flaggers present, Moderate delay, weather dependent | 47.589731 | -122.717074 | | Central | |
| Van Decar Road SE | Restricted | between | Van Skiver and Bielmeier | 3/1/2021 | 3/5/2021 | Maintenance | Moderate delays between 5 and 10 minutes | Ditching -Weather dependent/Flaggers present/Moderate delays | 47.486234 | -122.617258 | | South | |